
Resources
Office of Gas and Electricity Markets (OFGEM) Final Report [.pdf]
This report assesses the benefits to the deployment of certain renewable technologies. Tidal lagoon technology is discussed as a cost-effective renewable technology.
Tidal Lagoons in the Severn Estuary
This page provides more information on the full deployment of tidal lagoons in the Severn Estuary, the longest river in the U.K. Its enormous tidal range constitutes a very large renewable resource.
Tidal Electric instructed WS Atkins to conduct a feasibility study for a tidal lagoon to be built in Swansea Bay, a bay located in South Wales.
MetroTidal Project [external website]
Main website of MetroTidal Ltd., a U.K.-based engineering group. MetroTidal has announced proposals to build a crossing between Medway and Canvey Islands, as well as a surge-tide barrier, tidal power plant, and orbital rail and road routes.
PO Box 3
West Simsbury
Connecticut 06092
United States
U.S. Phone: [+1] 860.408.1400
U.S. Fax: [+1] 860.408.1402
49 Welbeck Street
London W1G 9XN
United Kingdom
U.K. Phone: [+44] (0) 778.530.7545
© 2010 Tidal Electric, Inc.